Part O overheating assessments
Homes that stay comfortable in summer, without giving up the glazing you designed.
Free 15-minute call, no obligation.
What it is
Part O of the Building Regulations limits overheating in new homes. It looks at how much sun the glazing lets in, how heat can be removed through opening windows or ventilation, and whether those openings are practical to use, for example at night, when noise or security might stop people opening them.
There are two ways to show compliance. The simplified method checks glazing areas and ventilation against set limits. Dynamic thermal modelling simulates the home hour by hour and is used where the simplified method can't be met.
Because glazing is often central to a design, this is one of the most useful things to check early.
When you need it
- Some New houses and flats
- Other new residential buildings, such as student accommodation and care homes
- Projects where large or south and west-facing glazing is part of the design
How I help
Early check.
I review the glazing and ventilation strategy at design stage and flag anything likely to fail.
Assessment.
I complete the simplified method assessment and the documents building control needs.
Options if it doesn't pass.
Clear choices, such as shading, glass specification or ventilation changes, so the design keeps what matters to you.
Dynamic modelling if needed.
Where the simplified method can't be met, I arrange dynamic thermal modelling through a trusted partner, with me as your one point of contact.
What I'll need from you
- Floor plans and elevations, including window sizes and which way each faces
- Details of opening windows and how far they open
- The ventilation strategy
- The site location and surroundings, such as nearby roads or noise sources
What you'll get
- A Part O assessment and the compliance documents for building control
- Clear notes on any changes needed, with options
FAQs
How long does a Part O assessment take?
How much does it cost?
Does Part O apply to extensions or conversions?
What happens if my design has a lot of glazing?
What's the difference between the simplified method and dynamic modelling?
Can Part O be done at the same time as the SAP?
Areas covered
Based in Southampton, I cover Eastleigh, Winchester, Romsey, Hedge End, Fareham, Portsmouth, Andover, the New Forest and across Hampshire. Desk-based work such as SAP and SBEM can be done for projects nationwide.
Have a project in mind?
Share the drawings or just ask a question. Whatever stage you're at, it's a good time to talk.