SAP calculations
Know your design will pass before work starts, with no redesigns and no surprises at sign-off.
Free 15-minute call, no obligation.
What it is
A SAP (Standard Assessment Procedure) calculation is how a home's energy performance is measured under Part L of the Building Regulations. It looks at the fabric, glazing, heating, hot water, ventilation and any renewables, and shows whether the design meets the targets for energy use and carbon emissions.
There are two stages. The design-stage SAP checks the plans before work starts. The as-built SAP confirms the finished home matches, using the real specification and air test result, and produces the on-construction EPC.
The earlier SAP is part of the conversation, the more room there is to get the fabric, glazing and heating right without changing the design later.
When you need it
- Every new home, including self-builds and each new flat
- Conversions that create a new dwelling, such as a barn or office conversion Part O overheating → Part G water efficiency →
- Extensions with a lot of glazing, where the whole home has to be shown to perform as well as one built to the standard limits
- Any project that needs an on-construction EPC at completion
How I help
Early check.
I review the drawings at concept or planning stage and flag anything likely to cause problems, such as glazing, fabric or the heating choice.
Design-stage SAP.
A full calculation and the documents building control needs before work starts, with clear options if anything needs adjusting.
Support during the build.
If a product or spec changes on site, I check it before it becomes a problem.
As-built SAP and EPC.
The final calculation using the real specification and air test, the compliance report, and the on-construction EPC lodged on the register.
What I'll need from you
- Floor plans, elevations and sections
- A site plan showing orientation
- The construction specification for walls, floors, roof, windows and doors
- Heating, hot water and ventilation details, plus any renewables
- For the as-built stage: any changes made on site, the air test result, commissioning certificates and the photographic evidence building control asks for
Not sure you have everything? Send what you've got and I'll tell you what's missing.
What you'll get
- Design-stage SAP calculation and compliance report for building control
- Predicted Energy Assessment
- As-built SAP calculation and compliance report
- On-construction EPC, lodged on the government register
- Clear notes on any changes needed, with options
FAQs
How long does a SAP calculation take?
How much does it cost?
When should I get a SAP done?
What's the difference between design-stage and as-built SAP?
What happens if the design doesn't pass?
Do I need an air test?
How will the Future Homes Standard affect my project?
Do you also do Part O and Part G?
Areas covered
Based in Southampton, I cover Eastleigh, Winchester, Romsey, Hedge End, Fareham, Portsmouth, Andover, the New Forest and across Hampshire. Desk-based work such as SAP and SBEM can be done for projects nationwide.
Have a project in mind?
Share the drawings or just ask a question. Whatever stage you're at, it's a good time to talk.