Thompson Energy Compliance Book a call
Thompson Energy Compliance

SBEM calculations

Lighting, glazing and services checked early, so your commercial project isn't held up at handover.

Free 15-minute call, no obligation.

What it is

SBEM (Simplified Building Energy Model) is how a commercial building's energy performance is assessed under Part L. It models the building's fabric, heating, cooling, ventilation, hot water and lighting zone by zone, and shows whether the design meets the targets for energy use and carbon emissions.

There's a design-stage calculation before work starts and an as-built calculation at completion, which produces the commercial EPC.

Bringing SBEM in early is especially useful on commercial projects, where lighting, glazing and services choices can be expensive to change once they're specified.

When you need it

  • New commercial buildings, such as offices, shops, warehouses, schools and healthcare buildings
  • Larger extensions to existing commercial buildings
  • Conversions and changes of use that create commercial space
  • Shell and core buildings, and first fit-outs where new building services are installed
  • Any project that needs a commercial EPC at completion Commercial EPCs →

How I help

  1. Early check.

    I review the drawings and services strategy and flag anything likely to cause problems.

  2. Design-stage SBEM.

    A full zone-by-zone model and the compliance report building control needs, with options if anything needs adjusting.

  3. Support during the build.

    Changes to lighting, plant or glazing on site are checked before they cause a problem.

  4. As-built SBEM and EPC.

    The final model using what was installed, the compliance report, and the commercial EPC lodged on the register.

What I'll need from you

  • Floor plans, elevations and sections
  • How each area will be used, such as office, storage or kitchen
  • The construction specification for walls, floors, roof and glazing
  • Heating, cooling, ventilation and hot water details
  • Lighting specification and controls
  • For the as-built stage: any changes made on site, the air test result and commissioning information

What you'll get

  • Design-stage SBEM calculation and compliance report for building control
  • As-built SBEM calculation and compliance report
  • Commercial EPC, lodged on the government register
  • Clear notes on any changes needed, with options

FAQs

How long does an SBEM calculation take?
It depends on the size of the building and the number of zones. Once I have the drawings and services information, I'll confirm a turnaround time with the quote.
How much does it cost?
SBEM is priced by floor area and the number of zones, so I quote per project.
What's the difference between SBEM and SAP?
SAP is used for homes; SBEM is used for commercial buildings. If a project mixes the two, such as flats above shops, both may be needed, and I can do both.
What do Level 3 and Level 4 mean?
They describe how complex a building's services are. Level 3 covers simpler buildings; Level 4 covers buildings with more complex systems such as air conditioning or mechanical ventilation. I'm accredited for both.
What if my building needs dynamic simulation modelling?
Some very complex buildings need a Level 5 assessment. If yours does, I'll tell you early and can recommend a specialist.
Can SBEM help with future energy standards?
Yes. The government has confirmed plans for larger rented commercial buildings to reach EPC B by 2031, so designing to a good rating now protects the building's value and lettability MEES for commercial landlords →.
Do you arrange air tightness testing for commercial buildings?
Yes, through a trusted partner, so you still deal with one point of contact Air tightness testing →.
I'm fitting out a shell unit. Do I need a new SBEM?
Usually, yes. When a fit-out adds heating, cooling or lighting, the work normally needs its own SBEM, built from the shell building's assessment. If that information isn't passed on, it can hold up sign-off right at the end, so it's worth asking for it early.

Areas covered

Based in Southampton, I cover Eastleigh, Winchester, Romsey, Hedge End, Fareham, Portsmouth, Andover, the New Forest and across Hampshire. Desk-based work such as SAP and SBEM can be done for projects nationwide.

Have a project in mind?

Share the drawings or just ask a question. Whatever stage you're at, it's a good time to talk.

CallWhatsApp